Aluminum anodes for an offshore frame

A 1,200 m² offshore frame needs 25 years of protection. Coating breakdown is 8% at mean conditions and 15% at end of life.

Inputs

SI units

Enter bare-metal design current density for each phase and its associated coating breakdown. Use final stand-off anode dimensions.

m²
yr
%
mA/m²
%
mA/m²
%
mA/m²
%
kg
m
m
V
Ω·m
Required mass
1,236.71 kg
Anodes needed
23
Output / anode
2.65 A
Capacity life
25.57 yr

Galvanic current field

Schematic
Galvanic current field (schematic, not to scale)Anode metalProtected steelConventional current through electrolyteDRIVING VOLTAGE0.25 VFINAL DEMAND28.8 AANODE OUTPUT2.65 A
Anode mass governs

Confirm final geometry, closed-circuit potentials, coating allowances and current distribution with the CP design basis.

Final demand ÷ modeled installed output

Calculation details

Alloy design capacity
2,000 A·h/kg
Initial demand
7.68 A
Mean demand
9.6 A
Final demand
28.8 A
Final single-anode resistance
0.0942 Ω
Count by net mass
23
Count by final current
11
Count for initial polarization
3
Installed net mass
1,265 kg
Total installed current output
61.04 A

Worked calculation

Starting values · SI
  1. Initial, mean and final current demands are 7.68, 9.6 and 28.8 A.
  2. Mean demand and 2,000 A·h/kg capacity give 1,236.70588 kg required alloy mass.
  3. Final resistance is 0.0942 Ω with 2.65402 A per anode. Count by mass is 23, by final current 11 and by initial current 3.

Compare anode count by capacity mass against count by final current. Verify the as-built net mass and fitted geometry.

Method and limits

  1. Estimate demand at three stages

    For each stage, demand = protected area × coating breakdown × corresponding bare current density. Convert percent to a fraction and mA/m² to A/m².

  2. Calculate net alloy mass

    M = mean demand × 8,760 × design years ÷ (capacity × utilization). Divide by net mass per anode and round up. Preset capacities are 2,000, 780 and 1,100 A·h/kg for aluminum, zinc and magnesium, respectively.

  3. Check final and initial current

    For a slender stand-off anode, R = ρ[ln(4L/r) − 1]/(2πL), with L ≥ 4r. Current per anode is ΔE/R. Round final demand divided by single-anode current up and select the larger of the mass and final current counts. The additional initial screen uses the same final geometry as a conservative check.