Dry-cooled site with zero site water use
A small dry-cooled site uses zero water within the entered boundary. The utility supplies electricity at a relatively high emissions factor.
Engineering schematic
Facility energy boundary
Annual energy savings at target 490.6 MWh.
Inputs
Calculation details
| Measure | Value |
|---|---|
| Power usage effectiveness | 1.308 |
| Data center infrastructure efficiency | 76.47 % |
| Site water usage effectiveness | 0 L/kWh |
| Grid carbon usage effectiveness | 666.92 g CO₂e/kWh |
| Annual facility energy | 5,956.8 MWh |
| Annual IT energy | 4,555.2 MWh |
| Total annual facility overhead | 1,401.6 MWh |
| Cooling overhead | 893.52 MWh |
| UPS & distribution losses | 385.44 MWh |
| Lighting overhead | 78.84 MWh |
| Other overhead | 43.8 MWh |
| Annual facility energy at target | 5,466.24 MWh |
| Annual energy savings | 490.56 MWh |
| Annual energy cost savings | 53,962 $ |
| Annual grid emissions avoided | 250.19 t CO₂e |
Update the highlighted inputs to see the results.
Starting calculation
- Divide 5,956.8 MWh of facility energy by 4,555.2 MWh of IT energy to get 1.308 PUE.
- At a target PUE of 1.2, facility energy becomes 5,466.24 MWh. The annual difference is 490.56 MWh.
Compare the water metric with CUE. The grid factor still drives electricity emissions. Include any other metered site water use in the WUE reading.
Calculation method
- PUE = Efacility ÷ EIT
- DCiE = 100 ÷ PUE
- Site WUE = site water (L) ÷ IT energy (kWh)
- Grid CUE = PUE × emissions factor
Enter average kW and operating hours, or enter annual MWh from matching meters. The unassigned portion of facility overhead appears as other overhead. Target savings hold IT energy, tariff and the grid emissions factor constant.
Engineering limits
Use total annual water consumption within the site boundary for site WUE, including cooling and other uses. Grid CUE covers the electricity in the entered facility boundary. Account separately for any on-site fuel or other emissions sources when reporting total operational CUE.
Related worked examples
DataCenterPUELab · Calculation sheet
Dry-cooled site with zero site water use
Annual energy savings at target 490.6 MWh.
Inputs
- Meter basis
- Average power
- Total facility
- 680 kW
- IT equipment
- 520 kW
- Annual operating hours
- 8760 h
- Cooling
- 102 kW
- UPS & distribution losses
- 44 kW
- Lighting
- 9 kW
- Annual site water use
- 0 m³
- Grid emissions factor
- 510 g/kWh
- Energy tariff
- 0.11 $/kWh
- Target PUE
- 1.2
Results
- Power usage effectiveness
- 1.308
- Data center infrastructure efficiency
- 76.47 %
- Site water usage effectiveness
- 0 L/kWh
- Grid carbon usage effectiveness
- 666.92 g CO₂e/kWh
- Annual facility energy
- 5,956.8 MWh
- Annual IT energy
- 4,555.2 MWh
- Total annual facility overhead
- 1,401.6 MWh
- Cooling overhead
- 893.52 MWh
- UPS & distribution losses
- 385.44 MWh
- Lighting overhead
- 78.84 MWh
- Other overhead
- 43.8 MWh
- Annual facility energy at target
- 5,466.24 MWh
- Annual energy savings
- 490.56 MWh
- Annual energy cost savings
- 53,962 $
- Annual grid emissions avoided
- 250.19 t CO₂e
Screening estimate. Confirm against facility and manufacturer data for engineering decisions.