Evaporative cooling water budget

An evaporative system saves compressor energy while using makeup water. Estimate water intensity for the same annual IT boundary.

Engineering schematic

Facility energy boundary

Live
Facility energy boundary PUE 1.189. DCIE 84.1 %. SITE WUE 2.07 L/kWh. GRID CUE 315 g CO₂e/kWh. See the results table for the full readout. PUE1.189DCIE84.1%SITE WUE2.07L/kWhGRID CUE315g CO₂e/kWh Facility meter15.4k MWhIT equipment13k MWhFacility overhead2,452.8 MWhCurrent overhead / target allowance0%135% usedLimit 100%

Annual energy savings at target 637.7 MWh.

Inputs

Meter readings

Use facility and IT readings from the same boundary and period.

kW
kW
h
Overhead breakdown
kW
kW
kW
Water, carbon & target

For site WUE, include cooling and other water uses within the site boundary.

m³
g/kWh
$/kWh

Calculation details

MeasureValue
Power usage effectiveness1.189
Data center infrastructure efficiency84.09 %
Site water usage effectiveness2.067 L/kWh
Grid carbon usage effectiveness315.14 g CO₂e/kWh
Annual facility energy15,417.6 MWh
Annual IT energy12,964.8 MWh
Total annual facility overhead2,452.8 MWh
Cooling overhead1,664.4 MWh
UPS & distribution losses569.4 MWh
Lighting overhead131.4 MWh
Other overhead87.6 MWh
Annual facility energy at target14,779.87 MWh
Annual energy savings637.73 MWh
Annual energy cost savings70,150 $
Annual grid emissions avoided169 t CO₂e

Starting calculation

  1. Divide 15,417.6 MWh of facility energy by 12,964.8 MWh of IT energy to get 1.189 PUE.
  2. At a target PUE of 1.14, facility energy becomes 14,779.87 MWh. The annual difference is 637.73 MWh.

Change the site water total to reflect metered consumption and note that the WUE moves independently of the PUE.

Calculation method

  • PUE = Efacility ÷ EIT
  • DCiE = 100 ÷ PUE
  • Site WUE = site water (L) ÷ IT energy (kWh)
  • Grid CUE = PUE × emissions factor

Enter average kW and operating hours, or enter annual MWh from matching meters. The unassigned portion of facility overhead appears as other overhead. Target savings hold IT energy, tariff and the grid emissions factor constant.

Engineering limits

Use total annual water consumption within the site boundary for site WUE, including cooling and other uses. Grid CUE covers the electricity in the entered facility boundary. Account separately for any on-site fuel or other emissions sources when reporting total operational CUE.