DataCenterPUELab

PUE target above the measured baseline

A planning sensitivity uses a higher target PUE than the metered value. Quantify the added facility energy at the same IT load.

Engineering schematic

Facility energy boundary

Live
Facility energy boundary PUE 1.22. DCIE 82 %. SITE WUE 0.82 L/kWh. GRID CUE 464 g CO₂e/kWh. See the results table for the full readout. PUE1.22DCIE82%SITE WUE0.82L/kWhGRID CUE464g CO₂e/kWh Facility meter10.7k MWhIT equipment8,760 MWhFacility overhead1,927.2 MWhCurrent overhead / target allowance0%76% usedLimit 100%

This target adds 613.2 MWh per year.

Inputs

Meter readings

Use facility and IT readings from the same boundary and period.

kW
kW
h
Overhead breakdown
kW
kW
kW
Water, carbon & target

For site WUE, include cooling and other water uses within the site boundary.

m³
g/kWh
$/kWh

Calculation details

MeasureValue
Power usage effectiveness1.22
Data center infrastructure efficiency81.97 %
Site water usage effectiveness0.822 L/kWh
Grid carbon usage effectiveness463.6 g CO₂e/kWh
Annual facility energy10,687.2 MWh
Annual IT energy8,760 MWh
Total annual facility overhead1,927.2 MWh
Cooling overhead1,051.2 MWh
UPS & distribution losses578.16 MWh
Lighting overhead175.2 MWh
Other overhead122.64 MWh
Annual facility energy at target11,300.4 MWh
Annual energy savings-613.2 MWh
Annual energy cost savings-67,452 $
Annual grid emissions avoided-233.02 t CO₂e

Starting calculation

  1. Divide 10,687.2 MWh of facility energy by 8,760 MWh of IT energy to get 1.22 PUE.
  2. At a target PUE of 1.29, facility energy becomes 11,300.4 MWh. The annual difference is -613.2 MWh.

Negative savings mean the scenario spends more energy and money. Reduce the target below the measured PUE to see the sign change.

Calculation method

  • PUE = Efacility ÷ EIT
  • DCiE = 100 ÷ PUE
  • Site WUE = site water (L) ÷ IT energy (kWh)
  • Grid CUE = PUE × emissions factor

Enter average kW and operating hours, or enter annual MWh from matching meters. The unassigned portion of facility overhead appears as other overhead. Target savings hold IT energy, tariff and the grid emissions factor constant.