Hyperscale annual meter reconciliation

A campus reports whole-year MWh from its utility and IT branch meters. Use annual energy directly.

Engineering schematic

Facility energy boundary

Live
Facility energy boundary PUE 1.216. DCIE 82.2 %. SITE WUE 0.88 L/kWh. GRID CUE 377 g CO₂e/kWh. See the results table for the full readout. PUE1.216DCIE82.2%SITE WUE0.88L/kWhGRID CUE377g CO₂e/kWh Facility meter121.6k MWhIT equipment100k MWhFacility overhead21.6k MWhCurrent overhead / target allowance0%127% usedLimit 100%

Annual energy savings at target 4,600 MWh.

Inputs

Meter readings

Use facility and IT readings from the same boundary and period.

MWh
MWh
Overhead breakdown
MWh
MWh
MWh
Water, carbon & target

For site WUE, include cooling and other water uses within the site boundary.

m³
g/kWh
$/kWh

Calculation details

MeasureValue
Power usage effectiveness1.216
Data center infrastructure efficiency82.24 %
Site water usage effectiveness0.88 L/kWh
Grid carbon usage effectiveness376.96 g CO₂e/kWh
Annual facility energy121,600 MWh
Annual IT energy100,000 MWh
Total annual facility overhead21,600 MWh
Cooling overhead14,300 MWh
UPS & distribution losses4,800 MWh
Lighting overhead900 MWh
Other overhead1,600 MWh
Annual facility energy at target117,000 MWh
Annual energy savings4,600 MWh
Annual energy cost savings391,000 $
Annual grid emissions avoided1,426 t CO₂e

Starting calculation

  1. Divide 121,600 MWh of facility energy by 100,000 MWh of IT energy to get 1.216 PUE.
  2. At a target PUE of 1.17, facility energy becomes 117,000 MWh. The annual difference is 4,600 MWh.

Read the MWh difference first. Multiplying that difference by the energy tariff gives annual cost savings at unchanged IT work.

Calculation method

  • PUE = Efacility ÷ EIT
  • DCiE = 100 ÷ PUE
  • Site WUE = site water (L) ÷ IT energy (kWh)
  • Grid CUE = PUE × emissions factor

Enter average kW and operating hours, or enter annual MWh from matching meters. The unassigned portion of facility overhead appears as other overhead. Target savings hold IT energy, tariff and the grid emissions factor constant.