DataCenterPUELab

Dry-cooled site with zero site water use

A small dry-cooled site uses zero water within the entered boundary. The utility supplies electricity at a relatively high emissions factor.

Engineering schematic

Facility energy boundary

Live
Facility energy boundary PUE 1.308. DCIE 76.5 %. SITE WUE 0 L/kWh. GRID CUE 667 g CO₂e/kWh. See the results table for the full readout. PUE1.308DCIE76.5%SITE WUE0L/kWhGRID CUE667g CO₂e/kWh Facility meter5,956.8 MWhIT equipment4,555.2 MWhFacility overhead1,401.6 MWhCurrent overhead / target allowance0%154% usedLimit 100%

Annual energy savings at target 490.6 MWh.

Inputs

Meter readings

Use facility and IT readings from the same boundary and period.

kW
kW
h
Overhead breakdown
kW
kW
kW
Water, carbon & target

For site WUE, include cooling and other water uses within the site boundary.

m³
g/kWh
$/kWh

Calculation details

MeasureValue
Power usage effectiveness1.308
Data center infrastructure efficiency76.47 %
Site water usage effectiveness0 L/kWh
Grid carbon usage effectiveness666.92 g CO₂e/kWh
Annual facility energy5,956.8 MWh
Annual IT energy4,555.2 MWh
Total annual facility overhead1,401.6 MWh
Cooling overhead893.52 MWh
UPS & distribution losses385.44 MWh
Lighting overhead78.84 MWh
Other overhead43.8 MWh
Annual facility energy at target5,466.24 MWh
Annual energy savings490.56 MWh
Annual energy cost savings53,962 $
Annual grid emissions avoided250.19 t CO₂e

Starting calculation

  1. Divide 5,956.8 MWh of facility energy by 4,555.2 MWh of IT energy to get 1.308 PUE.
  2. At a target PUE of 1.2, facility energy becomes 5,466.24 MWh. The annual difference is 490.56 MWh.

Compare the water metric with CUE. The grid factor still drives electricity emissions. Include any other metered site water use in the WUE reading.

Calculation method

  • PUE = Efacility ÷ EIT
  • DCiE = 100 ÷ PUE
  • Site WUE = site water (L) ÷ IT energy (kWh)
  • Grid CUE = PUE × emissions factor

Enter average kW and operating hours, or enter annual MWh from matching meters. The unassigned portion of facility overhead appears as other overhead. Target savings hold IT energy, tariff and the grid emissions factor constant.

Engineering limits

Use total annual water consumption within the site boundary for site WUE, including cooling and other uses. Grid CUE covers the electricity in the entered facility boundary. Account separately for any on-site fuel or other emissions sources when reporting total operational CUE.