Worked example · Shop costing
CNC router billable utilization
Test the hourly cost effect of a CNC router with 2,800 available hours and 65% billable utilization.
Hourly rate = Annual burden ÷ Billable hours + Allocated labor
Baseline reading
Only 1,820 hours absorb annual equipment cost in this workbook. Holding annual dollars fixed while raising billable hours lowers the equipment component.
What to test
Compare forecast utilization with quoted jobs actually invoiced. Check seasonal availability and paid operator hours separately.
Worksheet inputs
Inputs
Results
- All-in machine hourly rate
- $40.28/hr
- Total unit cost
- $2.34
- Quoted price per unit
- $2.76
| 10 units | $5.33 |
|---|---|
| 50 units | $2.92 |
| 250 units | $2.43 |
| 1,000 units | $2.34 |
- Total batch quote
- $2,763.23
- Setup amortized per unit
- $0.03
- Run cost per saleable unit
- $0.48
- Material per saleable unit
- $1.83
- Setup cost per batch
- $30.21
- Billable hours per year
- 1,820 hr
- Equipment burden rate
- $13.61/hr
- Allocated operator rate
- $26.67/hr
Model notes
The model uses straight-line depreciation with zero residual value and allocates annual machine costs over billable hours. Operator cost is spread over the stated machines per operator.
Run labor, machine time, and material are divided by yield. Setup is spread over the requested saleable quantity. Markup is applied to cost before taxes, freight, and selling adjustments.
Frequently asked questions
Should an idle day with no router orders enter available hours?
Define available hours using your capacity calendar. A day with capacity available and no jobs reduces the billable utilization ratio.
What happens if the router operator floats between jobs?