Radiant Loop Count With Long Manifold Leads

Measure how 45 ft one-way manifold runs change the usable active tubing and total circuit count for a remote slab.

Heated surface and tubing

Subtract walls, fixed cabinets and other areas without active tube.

Adds footage for turns and layout variation.

Manifold and heat load

Enter the one-way distance. The model adds supply and return tails.

Includes both tails. Use a lower limit when the hydraulic design calls for it.

Results

Example estimate
Total tubing including tails1,850.3 ft
SupplyReturn 174.3 ft active per loop
One circuit shown. Supply and return tails are included in the balanced loop length.
Balanced loop length
264.3 ft
Balanced circuits
7 loops
Manifold supply/return pairs
7 ports
Active tubing before tails
1,220.3 ft
Supply and return tails per loop
90 ft
Design floor load
18,480 BTU/h
Total manifold flow
2.46 GPM
Flow per loop
0.35 GPM
Modeled tubing velocity
0.64 ft/s
Tubing and assumed ID
PEX-A · 0.475 in ID
  • Verify tubing ID, bend radius, oxygen barrier, floor output and pump head for the installed system.

Worked example

Every circuit spends 90 ft on its route to and from the heated area. That leaves 185 ft of active length under the 275 ft circuit limit. Test moving the manifold closer to see how many ports drop out.

Total tubing including tails 1,850.3 ft

What to check next

Use the longest actual tail when testing a common loop plan. If tail lengths vary widely, balance using each circuit’s measured length and load.

Formulas and assumptions

Active tube
Active footage = floor area × 12 ÷ spacing in inches × (1 + routing allowance).
Balanced circuits
Circuit count = round up(active footage ÷ (loop limit − two manifold tails)). Balanced length = active footage ÷ circuits + tails.
Water flow
GPM = BTU/h ÷ (500 × supply-return ΔT). Divide system flow by the number of equally loaded circuits. The velocity uses representative tubing ID.

Frequently asked questions

Can the supply and return leads use up a third of a radiant circuit?

Yes. A 45 ft one-way route contributes 90 ft to circuit length. Account for that distance when assigning the active coverage.

Do manifold tails count as heated-floor output?

They are included in tubing and hydraulic length. Treat their heat output according to the actual route, insulation and location.

More sizing examples

Open the general radiant floor loops calculator