Radiant Floor PEX Tubing Length Calculator
Estimate ½-inch or ⅝-inch PEX footage, balanced circuits, manifold ports and flow for hydronic radiant floors at 6 to 12 inches on center.
Inputs
Results ↓Results
Example estimate- Balanced loop length
- 257.3 ft
- Balanced circuits
- 6 loops
- Manifold supply/return pairs
- 6 ports
- Active tubing before tails
- 1,400 ft
- Supply and return tails per loop
- 24 ft
- Design floor load
- 22,000 BTU/h
- Total manifold flow
- 2.93 GPM
- Flow per loop
- 0.49 GPM
- Modeled tubing velocity
- 0.89 ft/s
- Tubing and assumed ID
- PEX-A · 0.475 in ID
- Verify tubing ID, bend radius, oxygen barrier, floor output and pump head for the installed system.
Calculation inputs
- Net heated floor area
- 1000 ft²
- Tube spacing on center
- 9 in
- Nominal tubing size
- ½ in
- PEX type
- PEX-A
- Routing allowance
- 5 %
- Manifold distance per circuit
- 12 ft
- Maximum total circuit length
- 300 ft
- Design floor heat load
- 22 BTU/h·ft²
- Supply-to-return temperature drop
- 15 °F
Worked example
Lay out 1,000 heated ft² at 9 inches on center and add 12 ft from the manifold in each direction. The loop count must leave room for both tails within the selected total length.
Total tubing including tails 1,544 ft
Formulas and assumptions
- Active tube
- Active footage = floor area × 12 ÷ spacing in inches × (1 + routing allowance).
- Balanced circuits
- Circuit count = round up(active footage ÷ (loop limit − two manifold tails)). Balanced length = active footage ÷ circuits + tails.
- Water flow
- GPM = BTU/h ÷ (500 × supply-return ΔT). Divide system flow by the number of equally loaded circuits. The velocity uses representative tubing ID.
Frequently asked questions
Does the 300-foot example include both radiant manifold leads?
Yes. Circuit length includes the active serpentine and the full supply and return route between the floor and manifold.
Can I use a single spacing for every radiant floor zone?
Use a layout and output calculation that accounts for floor covering, perimeter losses and water temperature. Zones with different loads can need different spacing.
Does changing from PEX-A to PEX-B change estimated footage?
The geometric footage calculation uses area, spacing and routing. Confirm the selected product’s inside diameter, bend radius and oxygen barrier for hydraulic and installation design.