18 V AC half-wave auxiliary supply

A low-voltage transformer secondary feeds a single-diode rectifier and a constant-power auxiliary load.

Design inputs

Mains & bridge
Bus requirements

Enter 0 to use the governing capacitance.

View live readout ↑

Live readout

Edit inputs
Bulk cap
533.3 µF
Bus valley
17.94 V
Bus ripple
4.245 V
Hold-up
15.7 ms
Bulk capacitor bus Bulk capacitor bus 60 Hz mains VbusRipple cycleMains outageLow-line pk22.2 VBus floor12 VHold-up15.7 ms
The outage begins at the settled low-line valley. The bus voltage drops as stored capacitor energy supplies a constant load.
Bus design headroom available

Voltage headroom includes the entered surge allowance. Check inrush, capacitor tolerance and ripple-current rating separately.

Bus stress / voltage rating27.79 V / 35 V

Bus ripple / goal4.245 V / 5.5 V

Required / available hold-up7 ms / 15.7 ms

Result breakdown
Low-line input16.2 V RMS
Low-line rectified peak22.1903 V
Nominal rectified peak24.7358 V
High-line rectified peak27.7905 V
High-line stress with surge allowance27.7905 V
Constant power from bus3.85542 W
Valley at ripple target16.6903 V
Estimated operating valley17.945 V
Estimated peak-to-peak ripple4.24527 V
Discharge interval at ripple target14.7897 ms
Capacitance for ripple533.295 µF
Capacitance for hold-up401.115 µF
Governing capacitance533.295 µF
Governing requirementRipple
Capacitance used in readout680 µF
Estimated hold-up from valley15.6994 ms
Hold-up headroom8.69938 ms
Bus ripple headroom1.25473 V
High-line voltage headroom7.20945 V

Worked calculation

Cbulk = max(533.295 µF for ripple, 401.115 µF for hold-up) = 533.295 µF

Compare the long discharge interval with full-wave operation to see the different recharge rates.

Rectified peaks

Vpk,min = √2 · Vac,min − n · Vf | n = 2 (bridge), 1 (half wave)

Full-wave recharge events occur twice per mains cycle. Half-wave recharge occurs once. Under the ideal source model, recharge begins when the rising rectified sine crosses the falling bus.

Ripple & outage energy

Cripple = 2·Pin·tdis/(Vpk,min² − Vvalley²) | Chold = 2·Pin·thold/(Vvalley² − Vmin²)

Vvalley is the low-line peak minus target ripple. Sizing hold-up from that target valley is conservative. For the selected capacitance, the readout solves the modeled crossing and calculates available hold-up from its operating valley.

Hardware checks

Vheadroom = Vrated − (Vpk,high + Vsurge)

This margin covers the steady high-line crest plus the entered surge allowance. Verify surge waveform, ripple-current rating, tolerance and useful life against the actual capacitor. A real bridge requires inrush limiting, source-impedance and charge-pulse checks.