Rainwater Cistern Sizing for a 2,000 ft² Metal Roof
Estimate collection for a 2,000 ft² metal roof and test whether a 5,000-gallon cistern covers 90 gal/day.
Inputs
Results
Updates as you editThe cistern covers the entered demand in this monthly design year.
- End storage
- Collected
- Demand
- Capacity
Monthly averages cannot show the timing of individual storms or short dry spells.
- Diverter volume per qualifying storm
- 49.9 gal
- Annual demand
- 32,850 gal
- Unmet annual demand
- 0 gal
- Annual overflow
- 2,894.2 gal
- Idealized cyclic storage minimum
- 4,178.2 gal
- December ending storage
- 5,000 gal
- Annual first-flush diversion
- 3,091.9 gal
Inputs
- Horizontal roof footprint
- 2,000 ft²
- Roof surface
- Smooth metal · 95%
- Runoff coefficient override
- 0 %
- First-flush depth per storm
- 0.04 in
- Daily water demand
- 90 gal/day
- Usable cistern capacity
- 5,000 gal
- January starting fill
- 50 %
- Rainfall by month
- Jan 3.5 in · Feb 3.1 in · Mar 3.7 in · Apr 3.2 in · May 3.4 in · Jun 2.6 in · Jul 1.1 in · Aug 0.9 in · Sep 1.8 in · Oct 3.3 in · Nov 4.2 in · Dec 4.1 in
- First-flush events by month
- Jan 6 · Feb 6 · Mar 7 · Apr 6 · May 6 · Jun 4 · Jul 3 · Aug 2 · Sep 3 · Oct 5 · Nov 7 · Dec 7
Worked calculation
Estimate effective roof runoff
Gross runoff = horizontal roof footprint × rainfall depth × runoff coefficient
January: 2,000 ft² × 3.5 in × 95 % gives 4,145.5 gal.
Subtract the first-flush diversion
Diverter volume = footprint × first-flush depth. Monthly diversion is capped at that month’s roof runoff.
Each qualifying storm diverts up to 49.9 gal. January collects 3,846.2 gal after diversion.
Run the storage balance month by month
New storage = prior storage + collection − demand, bounded by zero and cistern capacity.
January starts with 2,500 gal, uses 2,790 gal and ends with 3,556.2 gal.
Check the full year and longest deficit
Sum each month. The largest cumulative monthly deficit sets the idealized cyclic storage minimum.
The roof supplies 38,244.2 gal against 32,850 gal of demand. With a suitable starting fill, at least 4,178.2 gal bridges the modeled deficits.
Monthly storage ledger
| Month | Collected | Demand | End storage | Shortfall | Overflow |
|---|---|---|---|---|---|
| Jan | 3,846 | 2,790 | 3,556 | 0 | 0 |
| Feb | 3,372 | 2,520 | 4,409 | 0 | 0 |
| Mar | 4,033 | 2,790 | 5,000 | 0 | 652 |
| Apr | 3,491 | 2,700 | 5,000 | 0 | 791 |
| May | 3,728 | 2,790 | 5,000 | 0 | 938 |
| Jun | 2,880 | 2,700 | 5,000 | 0 | 180 |
| Jul | 1,153 | 2,790 | 3,363 | 0 | 0 |
| Aug | 966 | 2,790 | 1,539 | 0 | 0 |
| Sep | 1,982 | 2,700 | 822 | 0 | 0 |
| Oct | 3,659 | 2,790 | 1,691 | 0 | 0 |
| Nov | 4,625 | 2,700 | 3,616 | 0 | 0 |
| Dec | 4,507 | 2,790 | 5,000 | 0 | 334 |
What this example shows
The 5,000-gallon cistern covers the modeled dry period. Reduce capacity below the cyclic estimate to see the first shortfall in the monthly table.
Frequently asked questions
Do I use sloped sheet area or roof footprint for the 2,000 ft² calculation?
Use the horizontal projection of the roof sections that drain to the cistern. Rain depth is measured over horizontal area.
How much water does one inch of rain yield on this metal roof before first flush?
One inch on 2,000 ft² is about 1,247 gallons before losses. At a 95% runoff factor, about 1,184 gallons reach the diverter.