Worked example · Hydrology

Warehouse redevelopment and runoff volume

An infill warehouse expands pavement within an already developed drainage boundary. The off-site zone keeps the same cover.

Inputs

Drainage zones
ZoneArea (acre)Pre CNPost CN
Zone 1
0–5,000 acre
30–98
30–98
Zone 2
0–5,000 acre
30–98
30–98
Zone 3
0–5,000 acre
30–98
30–98

Keep each zone footprint the same across both conditions. Subdivide cover where needed and use zero area for unused zones.

Rainfall event
0–60 in

Match the curve numbers to the selected abstraction convention.

Rainfall partition

Live results
Rainfall partition Post-development runoff increases. The volume change is post-development minus pre-development. POST RUNOFF 2.31 in PRE RUNOFF 1.44 in VOLUME CHANGE 0.522 acre-ft POST CN 92.5 Event rain3.1 in1.44 inExisting2.31 inDeveloped 0% · retainedPost runoff share100% · runoff

Post-development runoff increases

The volume change is post-development minus pre-development.

Calculation results

Post runoff
2.31 in
Pre runoff
1.44 in
Volume change
0.522 acre-ft
Post CN
92.5
Pre-development CN
81.7
Drainage area
7.2 acre
Pre retention
2.24 in
Post retention
0.81 in
Pre initial abstraction
0.45 in
Post initial abstraction
0.16 in
Pre runoff volume
0.861 acre-ft
Post runoff volume
1.383 acre-ft
Runoff depth change
0.87 in

Worked calculation

Compare runoff changes in depth and volume. The event rainfall is the same in both cases, so the difference comes from site cover.

S = 1000/CN − 10 (inches) · Iₐ = λS · Qd = (P − Iₐ)²/(P − Iₐ + S) for P > Iₐ, else 0.

The 0.20 option follows TR-55. The 0.05 option evaluates the entered CN values as supplied. For design with 0.05, use curve numbers calibrated to that choice. Weighted CN is evaluated before the nonlinear runoff equation. For strongly mixed or hydraulically disconnected cover, consider separate runoff calculations.

Open the main calculator

Share this calculation

This link opens the worksheet with your current inputs and units.