4 MGD Conventional Activated Sludge
Work through F/M, 7.17 days MCRT, SVI and carbon plus nitrification oxygen demand in a 4 MGD train.
Biological treatment / Worked example
Check a 50 mL/g SVI from 180 mL/L settled volume in a compacting activated sludge sample.
For engineering planning. Operators must follow site-specific permits, chemical safety data sheets (SDS), manufacturer specifications, and certified regulatory sampling requirements.
These steps walk through the starting inputs in US customary units. Edit the calculator above to test a different operating point.
Work through F/M, 7.17 days MCRT, SVI and carbon plus nitrification oxygen demand in a 4 MGD train.
Calculate F/M of about 0.042 d⁻¹, solids age and carbon-only oxygen demand for a 1.2 MGD extended aeration train.
Use a 640 mL/L settling test and 3,000 mg/L MLSS to identify the high-SVI warning in an activated sludge case.
Explore undefined finite solids age when both WAS and effluent TSS are entered as zero.
Separate carbon removal from nitrogen oxidation when 90% of a 45 mg/L TKN load is expected to nitrify.
F/M = (Q × BOD₅) / (V × MLVSS)Use influent load to the aeration stage and the volatile mixed-liquor inventory. With consistent volume and concentration units the result is per day.
MCRT = (V × MLSS + extra mass) / (QWAS × XWAS + Qeff × TSSₑ)The calculator estimates effluent flow as influent minus WAS. Include measured clarifier solids in extra inventory if using the whole-train basis. RAS stays within the inventory boundary.
SVI = 1,000 × SV₃₀ / MLSSUse 30-minute settled volume in mL/L and MLSS in mg/L. Compare time trends at the same test conditions.
AOR = f꜀ × load(BOD₅ removed) + 4.57 × load(N oxidized)The second term is optional. Use the fraction of incoming TKN expected to oxidize to nitrate. The carbon factor is empirical. This gross estimate excludes denitrification credit and oxygen transfer.
WEF 11 and EPA process-control guidance place F/M and MCRT in the context of plant operations. SVI below 70 or above 150 mL/g prompts review for atypical settling. Confirm actual settling, clarity and oxygen demand with samples and site data.
Yes. Small particles can remain suspended above dense settled solids. Inspect both phases of the sample.
WaterTreatLab / Low SVI and Pin-Floc Review
US customary units
For engineering planning. Operators must follow site-specific permits, chemical safety data sheets (SDS), manufacturer specifications, and certified regulatory sampling requirements.