Unbaffled Basin at 0.1 T₁₀/T

Compare 40 min nominal detention with 4 min effective contact time in an unbaffled chlorine basin.

Inputs

Contact segment
mg/L
gal
gpm
mg·min/L
Breakpoint screen
mg/L as N
mg/L as Cl₂

Results

US customary
Achieved CT
6 mg·min/L
Effective time T₁₀
4 min
CT / target
0.2 ×
Theoretical time T
40 min
Contact basinLive diagram
Contact basinFlow path and effective contact time for the selected baffling class. InletOutlet residualBaffling factor 0.1Theoretical time40 minEffective T₁₀4 minCT / target0.2 ×
Flow path and effective contact time for the selected baffling class.
Review the operating point
  • Achieved CT is below the entered target at this peak flow and residual.
Breakpoint demand
0 mg/L as Cl₂
Dose incl. entered residual
1.5 mg/L as Cl₂

For engineering planning. Operators must follow site-specific permits, chemical safety data sheets (SDS), manufacturer specifications, and certified regulatory sampling requirements.

Worked solution

These steps walk through the starting inputs in US customary units. Edit the calculator above to test a different operating point.

  1. Divide 80,000 gal by 2,000 gpm for 40 min theoretical time.
  2. Only 4 min credits to the effective contact time with BF 0.1. At 1.5 mg/L, CT is 6 mg·min/L, one fifth of the entered target.

More worked examples

Equations & conventions

Theoretical and effective time
T = V / Q, T₁₀ = T × BF

Use operating volume and peak flow for the same segment. EPA Table 4-2 uses 0.1, 0.3, 0.5, 0.7 and 1.0 for progressively improved baffling. Use approved tracer results when available.

Disinfection exposure
CT = C × T₁₀, CT ratio = CT / CTrequired

C is the measured disinfectant residual at the end of the segment. Use the applicable required CT for the disinfectant, organism, inactivation goal, temperature and pH.

Theoretical breakpoint
Dᵦ = 7.6 × ammonia-N + other demand

Express ammonia as N and chlorine as Cl₂. The optional residual allowance is added separately. Determine actual breakpoint from site demand testing and approved operating procedures.

Planning basis

A CT ratio at or above one means the calculated value meets your entered target for this segment. A regulated inactivation determination also requires the governing method, sampling, operating envelope and any segment accounting.

Questions

What would a tracer test add to the unbaffled calculation?

It characterizes actual residence-time distribution at the tested flows and levels. Use an approved tracer-derived T₁₀ for a site determination.