80-Foot Circular Drinking-Water Basin
Calculate area, surface overflow, sidewater detention and weir loading for an 80 ft circular water sedimentation basin.
Gravity separation
Calculate settling area, surface overflow, detention time and weir loading for circular and rectangular sedimentation basins.
For engineering planning. Operators must follow site-specific permits, chemical safety data sheets (SDS), manufacturer specifications, and certified regulatory sampling requirements.
Calculate area, surface overflow, sidewater detention and weir loading for an 80 ft circular water sedimentation basin.
Scale rectangular sedimentation area, 16 ft sidewater depth and a 150 ft weir for a 2.4 MGD flow.
Compare a 90 ft primary wastewater clarifier at 6 MGD with EPA surface, detention and outlet-weir reference ranges.
Check a compact rectangular basin at 2.2 MGD with reduced hydraulic detention and high weir loading.
Calculate the hydraulic loading of a circular secondary clarifier before evaluating solids loading and settling.
Use a single basin’s 1.8 MGD share of plant flow to calculate a 110 × 42 ft sedimentation unit’s hydraulic loading.
A = πD²/4 or L × W, V = A × SWDUse the plan area and operating sidewater depth. The idealized prism/cylinder excludes volume changes from hoppers, internals and sludge.
SOR = Q / A, HRT = V / QWith Q in gal/day and A in ft², SOR is gpd/ft². With V in gal, multiply V/Q by 24 to get hours.
WOR = Q / LweirEnter effective, active weir length. Count both contributing launder sides when both accept flow. Use one basin’s flow, area and weir length.
Ten States §4.2.5 gives 4 h conventional water sedimentation, an authority-approved reduced-time pathway at 0.5 gpm/ft² or demonstrated equivalent settling, and 20,000 gpd/ft outlet loading. EPA primary wastewater reference bands are 600–1,200 gpd/ft², 1–4 h and 10,000–20,000 gpd/ft. AWWA M37 covers water clarification design context.
Enter the flow actually distributed to the basin. In a parallel train with an even split, divide total flow by the number of online basins.
Depth increases nominal detention time. Surface overflow is flow divided by horizontal settling area and depends on area and flow.
WaterTreatLab / Current operating point
US customary units
For engineering planning. Operators must follow site-specific permits, chemical safety data sheets (SDS), manufacturer specifications, and certified regulatory sampling requirements.