WaterTreatLab

Gravity separation / Worked example

120 × 50 ft Rectangular Water Basin

Scale rectangular sedimentation area, 16 ft sidewater depth and a 150 ft weir for a 2.4 MGD flow.

Inputs

Plant & geometry
ft
ft
ft
Hydraulic loading
MGD
ft

Results

US customary
Surface overflow
400 gpd/ft² 0.6791 m/h
Detention time
7.1813 h
Weir loading
16,000 gpd/ft 198.71 m³/(m·d)
Settling area
6,000 ft²
Sedimentation basin sectionLive diagram
Sedimentation basin sectionSection profile and hydraulic loading for a single basin. InfluentRectangular basinEffluent weirPlan area6,000 ft²Sidewater depth16 ftWeir loading16,000 gpd/ft
Section profile and hydraulic loading for a single basin.
Active basin volume
718,130 gal

For engineering planning. Operators must follow site-specific permits, chemical safety data sheets (SDS), manufacturer specifications, and certified regulatory sampling requirements.

Worked solution

These steps walk through the starting inputs in US customary units. Edit the calculator above to test a different operating point.

  1. The plan area is 6,000 ft². Dividing 2.4 million gal/day by the area gives 400 gpd/ft².
  2. The 96,000 ft³ water prism gives 7.18 h theoretical detention. Weir loading is 2.4 million ÷ 150 = 16,000 gpd/ft.

More worked examples

Equations & conventions

Surface area and volume
A = πD²/4 or L × W, V = A × SWD

Use the plan area and operating sidewater depth. The idealized prism/cylinder excludes volume changes from hoppers, internals and sludge.

Surface overflow and detention
SOR = Q / A, HRT = V / Q

With Q in gal/day and A in ft², SOR is gpd/ft². With V in gal, multiply V/Q by 24 to get hours.

Weir loading
WOR = Q / Lweir

Enter effective, active weir length. Count both contributing launder sides when both accept flow. Use one basin’s flow, area and weir length.

Planning basis

Ten States §4.2.5 gives 4 h conventional water sedimentation, an authority-approved reduced-time pathway at 0.5 gpm/ft² or demonstrated equivalent settling, and 20,000 gpd/ft outlet loading. EPA primary wastewater reference bands are 600–1,200 gpd/ft², 1–4 h and 10,000–20,000 gpd/ft. AWWA M37 covers water clarification design context.

Questions

What does the 16 ft sidewater depth represent?

Use the operating depth near the basin sidewall. Volume from a hopper or displaced by internals may need a separate estimate.