Gravity separation / Worked example

100-Foot Secondary Clarifier Hydraulics

Calculate the hydraulic loading of a circular secondary clarifier before evaluating solids loading and settling.

Inputs

Plant & geometry
ft
ft
Hydraulic loading
MGD
ft

Results

US customary
Surface overflow
827.61 gpd/ft² 1.4051 m/h
Detention time
3.4709 h
Weir loading
21,667 gpd/ft 269.09 m³/(m·d)
Settling area
7,854 ft²
Sedimentation basin sectionLive diagram
Sedimentation basin sectionSection profile and hydraulic loading for a single basin. InfluentCircular basinEffluent weirPlan area7,854 ft²Sidewater depth16 ftWeir loading21,667 gpd/ft
Section profile and hydraulic loading for a single basin.
Review the operating point
  • Secondary clarifiers also require peak solids-loading, return-sludge and settleability checks.
Active basin volume
940,030 gal

For engineering planning. Operators must follow site-specific permits, chemical safety data sheets (SDS), manufacturer specifications, and certified regulatory sampling requirements.

Worked solution

These steps walk through the starting inputs in US customary units. Edit the calculator above to test a different operating point.

  1. A 100 ft diameter provides 7,854 ft² of plan area and about 828 gpd/ft² at 6.5 MGD.
  2. At 16 ft water depth, nominal HRT is 3.47 h. The 300 ft weir receives about 21,667 gpd/ft.

More worked examples

Equations & conventions

Surface area and volume
A = πD²/4 or L × W, V = A × SWD

Use the plan area and operating sidewater depth. The idealized prism/cylinder excludes volume changes from hoppers, internals and sludge.

Surface overflow and detention
SOR = Q / A, HRT = V / Q

With Q in gal/day and A in ft², SOR is gpd/ft². With V in gal, multiply V/Q by 24 to get hours.

Weir loading
WOR = Q / Lweir

Enter effective, active weir length. Count both contributing launder sides when both accept flow. Use one basin’s flow, area and weir length.

Planning basis

Ten States §4.2.5 gives 4 h conventional water sedimentation, an authority-approved reduced-time pathway at 0.5 gpm/ft² or demonstrated equivalent settling, and 20,000 gpd/ft outlet loading. EPA primary wastewater reference bands are 600–1,200 gpd/ft², 1–4 h and 10,000–20,000 gpd/ft. AWWA M37 covers water clarification design context.

Questions

What additional information is needed for a secondary clarifier check?

Use the actual influent solids, return sludge rate, settling properties and peak solids loading alongside the hydraulic results.