Civil aviation case

Flight controller solder fatigue

An avionics board sees half a thermal cycle per day in service. Apply a faster, wider chamber profile to 400 completed cycles.

Inputs

°C
°C
cycles/day
cycles/day
°C
°C
eV
FailBelow mission cycle goal
Cycle AF
1.9683×
Field cycles
787.319
Field years
4.31408yr
Goal coverage
49.2074%

Acceleration by test temperature swing

Thermal cycle acceleration versus test temperature swingThermal cycling · log₁₀ AF-1.06-0.1540.74742.594.3146198Test swing ΔT (°C)Cycle AFEntered test

The curve varies chamber swing while holding the cycle rates and peak temperatures fixed. Its y-axis is logarithmic.

Download

Detailed results

Swing term
3.296187 ×
Frequency term
0.4239777 ×
Peak-temperature term
1.408431 ×
Mission cycle goal
1,600 cycles
Remaining field cycles
812.6813 cycles

Equivalent years depend on the measured use cycle rate. Read the cycle coverage before converting to calendar time.

Formula trace

  1. Swing factor = (ΔTtest / ΔTuse)ᵐThe swing ratio contributes 3.296187×.
  2. Frequency factor = (fuse / ftest)ᵠThe cycle-rate ratio contributes 0.4239777×.
  3. Peak factor = exp[(Eₐ/k)(1/Tmax,use − 1/Tmax,test)]The peak-temperature term contributes 1.408431×.
  4. Field cycles = Ntest × AF · Years = Field cycles / (365 fuse)400 test cycles give 787.3187 field cycles at 0.5 cycles/day.

Model assumptions

Use exponents fitted to the joint material, package and cycling profile. Frequency is cycles per day. Setting q and Eₐ to zero gives the simple swing-power Coffin–Manson approximation.

Method and sources

Related examples