Legacy colo cooling retrofit
A 1.2 MW IT hall is replacing legacy chilled-water equipment. Compare its current overhead with a 1.30 PUE budget.
Engineering schematic
Facility energy boundary
Annual energy savings at target 3,416.4 MWh.
Inputs
Calculation details
| Measure | Value |
|---|---|
| Power usage effectiveness | 1.625 |
| Data center infrastructure efficiency | 61.54 % |
| Site water usage effectiveness | 1.332 L/kWh |
| Grid carbon usage effectiveness | 617.5 g CO₂e/kWh |
| Annual facility energy | 17,082 MWh |
| Annual IT energy | 10,512 MWh |
| Total annual facility overhead | 6,570 MWh |
| Cooling overhead | 4,642.8 MWh |
| UPS & distribution losses | 1,182.6 MWh |
| Lighting overhead | 262.8 MWh |
| Other overhead | 481.8 MWh |
| Annual facility energy at target | 13,665.6 MWh |
| Annual energy savings | 3,416.4 MWh |
| Annual energy cost savings | 375,804 $ |
| Annual grid emissions avoided | 1,298.23 t CO₂e |
Update the highlighted inputs to see the results.
Starting calculation
- Divide 17,082 MWh of facility energy by 10,512 MWh of IT energy to get 1.625 PUE.
- At a target PUE of 1.3, facility energy becomes 13,665.6 MWh. The annual difference is 3,416.4 MWh.
The other-overhead row reconciles the branch readings to the utility meter. Leave that remainder in the facility boundary.
Calculation method
- PUE = Efacility ÷ EIT
- DCiE = 100 ÷ PUE
- Site WUE = site water (L) ÷ IT energy (kWh)
- Grid CUE = PUE × emissions factor
Enter average kW and operating hours, or enter annual MWh from matching meters. The unassigned portion of facility overhead appears as other overhead. Target savings hold IT energy, tariff and the grid emissions factor constant.
Engineering limits
Use total annual water consumption within the site boundary for site WUE, including cooling and other uses. Grid CUE covers the electricity in the entered facility boundary. Account separately for any on-site fuel or other emissions sources when reporting total operational CUE.
Related worked examples
DataCenterPUELab · Calculation sheet
Legacy colo cooling retrofit
Annual energy savings at target 3,416.4 MWh.
Inputs
- Meter basis
- Average power
- Total facility
- 1950 kW
- IT equipment
- 1200 kW
- Annual operating hours
- 8760 h
- Cooling
- 530 kW
- UPS & distribution losses
- 135 kW
- Lighting
- 30 kW
- Annual site water use
- 14000 m³
- Grid emissions factor
- 380 g/kWh
- Energy tariff
- 0.11 $/kWh
- Target PUE
- 1.3
Results
- Power usage effectiveness
- 1.625
- Data center infrastructure efficiency
- 61.54 %
- Site water usage effectiveness
- 1.332 L/kWh
- Grid carbon usage effectiveness
- 617.5 g CO₂e/kWh
- Annual facility energy
- 17,082 MWh
- Annual IT energy
- 10,512 MWh
- Total annual facility overhead
- 6,570 MWh
- Cooling overhead
- 4,642.8 MWh
- UPS & distribution losses
- 1,182.6 MWh
- Lighting overhead
- 262.8 MWh
- Other overhead
- 481.8 MWh
- Annual facility energy at target
- 13,665.6 MWh
- Annual energy savings
- 3,416.4 MWh
- Annual energy cost savings
- 375,804 $
- Annual grid emissions avoided
- 1,298.23 t CO₂e
Screening estimate. Confirm against facility and manufacturer data for engineering decisions.