A 1.2 MW IT hall is replacing legacy chilled-water equipment. Compare its current overhead with a 1.30 PUE budget.

Engineering schematic

Facility energy boundary

Live
Facility energy boundary PUE 1.625. DCIE 61.5 %. SITE WUE 1.33 L/kWh. GRID CUE 618 g CO₂e/kWh. See the results table for the full readout. PUE1.625DCIE61.5%SITE WUE1.33L/kWhGRID CUE618g CO₂e/kWh Facility meter17.1k MWhIT equipment10.5k MWhFacility overhead6,570 MWhCurrent overhead / target allowance0%208% usedLimit 100%

Annual energy savings at target 3,416.4 MWh.

Inputs

Meter readings

Use facility and IT readings from the same boundary and period.

kW
kW
h
Overhead breakdown
kW
kW
kW
Water, carbon & target

For site WUE, include cooling and other water uses within the site boundary.

m³
g/kWh
$/kWh

Calculation details

MeasureValue
Power usage effectiveness1.625
Data center infrastructure efficiency61.54 %
Site water usage effectiveness1.332 L/kWh
Grid carbon usage effectiveness617.5 g CO₂e/kWh
Annual facility energy17,082 MWh
Annual IT energy10,512 MWh
Total annual facility overhead6,570 MWh
Cooling overhead4,642.8 MWh
UPS & distribution losses1,182.6 MWh
Lighting overhead262.8 MWh
Other overhead481.8 MWh
Annual facility energy at target13,665.6 MWh
Annual energy savings3,416.4 MWh
Annual energy cost savings375,804 $
Annual grid emissions avoided1,298.23 t CO₂e

Starting calculation

  1. Divide 17,082 MWh of facility energy by 10,512 MWh of IT energy to get 1.625 PUE.
  2. At a target PUE of 1.3, facility energy becomes 13,665.6 MWh. The annual difference is 3,416.4 MWh.

The other-overhead row reconciles the branch readings to the utility meter. Leave that remainder in the facility boundary.

Calculation method

  • PUE = Efacility ÷ EIT
  • DCiE = 100 ÷ PUE
  • Site WUE = site water (L) ÷ IT energy (kWh)
  • Grid CUE = PUE × emissions factor

Enter average kW and operating hours, or enter annual MWh from matching meters. The unassigned portion of facility overhead appears as other overhead. Target savings hold IT energy, tariff and the grid emissions factor constant.

Engineering limits

Use total annual water consumption within the site boundary for site WUE, including cooling and other uses. Grid CUE covers the electricity in the entered facility boundary. Account separately for any on-site fuel or other emissions sources when reporting total operational CUE.

Related worked examples