DLI, PPFD and grow light coverage calculator
Convert PPFD and photoperiod to daily light integral. Estimate LED wattage, canopy coverage, fixture count and monthly electricity cost.
Inputs
Results
Total daily light integral
Vegetative canopy · 20–35 mol/m²/day planning band
- Lamp contribution
- 38.88 mol/m²/day
- Estimated target power
- 419.7 W
- Coverage per fixture at target PPFD
- 17.15 ft²
- Whole fixtures at rated power
- 1
- Target-power energy
- 226.64 kWh/month
- Target-power electricity cost
- 40.8 USD/month
- Whole-fixture electricity cost
- 43.74 USD/month
Crop target gauge
Illustrative range. Set a crop-specific target before choosing fixtures.
Inputs used
- Average lamp PPFD
- 600 µmol/m²/s
- Photoperiod
- 18 h/day
- Measured sunlight DLI
- 0 mol/m²/day
- Target band
- Vegetative canopy
- Canopy area
- 16 ft²
- Fixture photon efficacy
- 2.5 µmol/J
- Light reaching canopy
- 85 %
- Power per fixture
- 450 W
- Electricity rate
- 0.18 USD/kWh
- Days lit per month
- 30 days
Worked calculation
- Integrate lamp PPFD over the photoperiod
600 × 18 × 0.0036 = 38.88 mol/m²/day
- Add measured sunlight contribution
38.88 + 0 = 38.88 mol/m²/day
- Convert canopy photon demand into wall power
600 × 1.4864 m² ÷ (2.5 × 0.85) = 419.7 W
- Find area per fixture at target PPFD
450 × 2.5 × 0.85 ÷ 600 = 17.15 ft²
- Price the scheduled energy
0.4197 kW × 18 h × 30 days × $0.18 = $40.8 per month at target power
How the model works
The 0.0036 factor converts micromoles per second over an hour into moles per day. Use average canopy PPFD for an even lamp schedule. For variable daylight, record the sunlight DLI separately and add it once.
Photon efficacy describes fixture output per watt of electrical input. The canopy capture percentage models optical and edge losses. Mounting height, dimming, spacing and reflection affect the delivered PPFD. Check a fixture map or measure several locations across the canopy.
References
Common questions
What is the difference between PPFD, PPF and DLI?
PPF is a fixture’s total photon output per second. PPFD is the photon flux arriving per square meter per second. DLI is the daily total received per square meter.
Does the whole-fixture cost assume dimming?
Whole-fixture cost uses the ceiling fixture count at rated wattage. The target-power cost estimates ideal operation at the calculated power level.