Well tank sizing

Parallel Pressure Tanks During an 8 GPM Demand

Estimate combined drawdown for two identical 44-gallon tanks with matching pre-charge on a 40/60 switch.

Inputs

Usable drawdown22.7 gal

Tank and pressure switch

gal
gpm
gpm
minUse the motor manufacturer’s minimum.
Pre-charge and elevation
ft

Results

Updates as you edit
Usable drawdown22.7 gal

The no-demand refill is shorter than the entered minimum pump run time.

Water in tank versus pressure
Water in tank versus pressureThe two switch points enclose the usable drawdown. Air compression is modeled as isothermal.013.4426.8840.3253.7667.208.6317.2625.8934.51Gauge pressure (psig)Water volume (gal)Cut-in · 3.22 galCut-out · 25.92 gal
  • Water in tank

The two switch points enclose the usable drawdown. Air compression is modeled as isothermal.

Minimum nominal tank volume
108.5 gal
Shortest run time (no demand)
1.62 min
Refill time at entered demand
3.78 min
Pump-off time at entered demand
2.84 min
Usable acceptance fraction
25.8 %
Recommended drained pre-charge
38 psig
Drawdown for run time target
28 gal
Water in tank at cut-out
25.92 gal

Worked calculation

  1. Convert gauge pressure to absolute pressure

    Pabs = gauge pressure + local atmospheric pressure

    The cut-in, cut-out and pre-charge are 54.7 psia, 74.7 psia, 52.7 psia on an absolute basis.

  2. Compute the water fraction at both switch points

    Boyle’s law: P₀V₀ = PVair. Water fraction = max(0, 1 − P₀/P).

    The water fraction increases from 3.66 % to 29.45 %, a gain of 25.8 %.

  3. Multiply by the nominal tank volume

    Drawdown = nominal tank volume × change in water fraction

    88 gal × 25.8 % gives 22.7 gal of usable water.

  4. Check run time and size the tank

    Shortest refill = drawdown / pump flow. Minimum tank = pump flow × run time / usable fraction.

    14 gpm over 2 min requires 28 gal of drawdown. That corresponds to 108.5 gal of nominal tank volume.

What this example shows

Using 88 gallons represents two matched 44-gallon tanks sharing the same pressure. While demand is steady, the tank refills at the difference between pump delivery and consumption.

Frequently asked questions

Can I add the two nominal tank volumes directly in this example?

Yes for matched pre-charge and the same connection pressure under the model. With different pre-charges, compute each tank’s drawdown separately and add those values.

What happens to refill if demand reaches 14 gpm in this system?

Net refill flow reaches zero at that demand. A continuing load at or above pump delivery keeps the system from reaching cut-out.