Parallel Pressure Tanks During an 8 GPM Demand
Estimate combined drawdown for two identical 44-gallon tanks with matching pre-charge on a 40/60 switch.
Inputs
Results
Updates as you editThe no-demand refill is shorter than the entered minimum pump run time.
- Water in tank
The two switch points enclose the usable drawdown. Air compression is modeled as isothermal.
- Minimum nominal tank volume
- 108.5 gal
- Shortest run time (no demand)
- 1.62 min
- Refill time at entered demand
- 3.78 min
- Pump-off time at entered demand
- 2.84 min
- Usable acceptance fraction
- 25.8 %
- Recommended drained pre-charge
- 38 psig
- Drawdown for run time target
- 28 gal
- Water in tank at cut-out
- 25.92 gal
Inputs
- Pressure switch
- 40 / 60 psi
- Nominal tank volume
- 88 gal
- Pump delivery at tank
- 14 gpm
- Demand while cycling
- 8 gpm
- Minimum pump run time
- 2 min
- Pre-charge setting
- 2 psi below cut-in
- Site elevation
- 0 ft
Worked calculation
Convert gauge pressure to absolute pressure
Pabs = gauge pressure + local atmospheric pressure
The cut-in, cut-out and pre-charge are 54.7 psia, 74.7 psia, 52.7 psia on an absolute basis.
Compute the water fraction at both switch points
Boyle’s law: P₀V₀ = PVair. Water fraction = max(0, 1 − P₀/P).
The water fraction increases from 3.66 % to 29.45 %, a gain of 25.8 %.
Multiply by the nominal tank volume
Drawdown = nominal tank volume × change in water fraction
88 gal × 25.8 % gives 22.7 gal of usable water.
Check run time and size the tank
Shortest refill = drawdown / pump flow. Minimum tank = pump flow × run time / usable fraction.
14 gpm over 2 min requires 28 gal of drawdown. That corresponds to 108.5 gal of nominal tank volume.
What this example shows
Using 88 gallons represents two matched 44-gallon tanks sharing the same pressure. While demand is steady, the tank refills at the difference between pump delivery and consumption.
Frequently asked questions
Can I add the two nominal tank volumes directly in this example?
Yes for matched pre-charge and the same connection pressure under the model. With different pre-charges, compute each tank’s drawdown separately and add those values.
What happens to refill if demand reaches 14 gpm in this system?
Net refill flow reaches zero at that demand. A continuing load at or above pump delivery keeps the system from reaching cut-out.