Piping hydraulics

Schedule 40 vs 80 PVC Friction at the Same Size

Compare 1-inch Schedule 40 and Schedule 80 PVC at 11 gpm over 150 ft, with equal fitting K values.

Inputs

Darcy total head loss11.82 ft

Pipe and flow

gpm
ftMeasure along the pipe, including vertical runs.
°F
Same as primary carries through its C and roughness settings.
Fittings and pipe overrides
K = 0.9 each for this estimate.
K = 2.5 each for this estimate.
Sum the K values for other fittings.
inEnter 0 to use the nominal-size table.
Enter 0 to use the material preset.
inEnter 0 to use the material preset.

Water hammer inputs

ft/sUse a pipe-specific wave speed where available.
s
%
psig

Results

Updates as you edit
Darcy total head loss11.82 ft

Turbulent flow. Velocity is within the 5 ft/s design screening threshold. Closure falls in the sudden-closure screening range.

Head loss versus flow
Head loss versus flowEach curve includes the entered fitting K. The marker identifies the primary Darcy–Weisbach duty.03.36.69.913.216.5010.420.831.241.59Flow (gpm)Total loss (ft)Design flow · 11.82 ft
  • Darcy–Weisbach
  • Hazen–Williams
  • Comparison · Darcy

Each curve includes the entered fitting K. The marker identifies the primary Darcy–Weisbach duty.

Hazen–Williams total head loss
11.4 ft
Darcy pressure drop
5.11 psi
Water velocity
4.08 ft/s
Reynolds number
33,047
Darcy friction factor
0.02303
Fitting head loss
1.58 ft
Pipe inside diameter
1.049 in
Comparison Darcy loss
18.16 ft
Comparison Hazen–Williams loss
17.64 ft
Comparison velocity
4.91 ft/s
Comparison inside diameter
0.957 in
Sudden-closure pressure rise
60.42 psi
Initial pressure + sudden-closure rise
105.42 psig
Wave round-trip time
0.2727 s

Worked calculation

  1. Find velocity and flow regime

    v = Q/A. Re = ρvD/μ.

    11 gpm in a 1.049 in bore gives 4.08 ft/s. Re = 33,047 (turbulent).

  2. Calculate straight-pipe loss two ways

    Darcy: f(L/D)v²/(2g). Hazen–Williams: 10.67 L(Q/C)¹·⁸⁵² / D⁴·⁸⁷⁰⁴ in SI.

    Across 150 ft, Darcy gives 10.24 ft and Hazen–Williams gives 9.82 ft.

  3. Add fitting losses

    Hₖ = ΣK v²/(2g)

    Total K is 6.1 and adds 1.58 ft. Total Darcy loss is 11.82 ft. The comparison bore gives 18.16 ft at the same flow.

  4. Screen surge from a sudden change in flow

    Δp = ρaΔv. Wave round-trip time = 2L/a.

    The arrested velocity is 4.08 ft/s and the wave speed is 1,100 ft/s. The pressure rise estimate is 60.42 psi with a round-trip time of 0.2727 s.

What this example shows

The Schedule 80 comparison has a smaller bore. Hold length and fitting K equal to see the flow penalty associated with that wall thickness.

Frequently asked questions

Does this Schedule 40 vs 80 comparison use different Hazen C values?

Both PVC presets use C = 150 here. The modeled difference comes from bore and the change in velocity.

Why does equal fitting K give different fitting loss for these schedules?

Fitting head is K multiplied by velocity head. The same flow runs faster in the smaller Schedule 80 bore.