Pump Head Through 800 ft of Schedule 80 PVC
See how a 1½-inch Schedule 80 line affects an 18 gpm spring-to-tank transfer with 73 ft of static lift.
Inputs
Results
Updates as you editThe candidate curve has sufficient head at the target flow.
- System curve
- Entered pump curve
The two-point pump curve is an interpolation. The system curve holds the entered pumping water level fixed.
- Static elevation lift
- 73 ft
- Outlet pressure head
- 0 ft
- Darcy straight-pipe loss
- 23.65 ft
- Hazen–Williams straight-pipe loss
- 22.85 ft
- Fitting loss
- 1.01 ft
- Pipe velocity
- 3.27 ft/s
- Pipe inside diameter
- 1.5 in
- Candidate head at target
- 139.52 ft
- Estimated intersection flow
- 25.25 gpm
- Estimated intersection head
- 117.76 ft
Inputs
- Target flow
- 18 gpm
- Static water depth
- 30 ft
- Pumping drawdown
- 5 ft
- Outlet above wellhead
- 38 ft
- Required outlet pressure
- 0 psig
- Pipe material
- PVC Schedule 80
- Nominal pipe size
- 1½ in nominal
- Developed pipe length
- 800 ft
- Use friction method
- Hazen–Williams
- Water temperature
- 68 °F
- 90° elbows
- 4
- Check valves
- 1
- Additional fitting K
- 0
- Measured inside diameter
- 0 in
- Hazen–Williams C override
- 0
- Darcy roughness override
- 0 in
- Shutoff head at zero flow
- 162 ft
- Rated curve flow
- 35 gpm
- Head at rated curve flow
- 77 ft
Worked calculation
Find the pumping water level
Pumping depth = static depth + drawdown
30 ft + 5 ft = 35 ft below the wellhead. The outlet then gives 73 ft of static lift.
Convert delivery pressure to head
Hₚ = p / (ρg)
0 psig gives 0 ft of pressure head at the entered water temperature.
Add pipe and fitting losses
H𝒻 = f(L/D) v²/(2g) or 10.67 L(Q/C)¹·⁸⁵² / D⁴·⁸⁷⁰⁴ in SI. Hₖ = ΣK v²/(2g).
At 18 gpm the selected method adds 22.85 ft and fittings add 1.01 ft.
Build the duty point
TDH = static lift + pressure head + straight-pipe loss + fittings
73 ft + 0 ft + 22.85 ft + 1.01 ft = 96.86 ft.
Compare with the candidate pump
H(Q) = H₀ − (H₀ − H₁)(Q/Q₁)²
The candidate develops 139.52 ft at 18 gpm, a head difference of 42.66 ft.
What this example shows
Change the material to Schedule 40 while keeping nominal size and flow steady. The wider bore reduces straight-pipe loss. Check pressure and temperature rating separately when selecting pipe.
Frequently asked questions
Why does Schedule 80 add head at equal flow?
Its thicker wall reduces the inside diameter at a given nominal size, which raises velocity and friction.
Can the long spring transfer use a surveyed straight-line distance?
Measure the developed pipe run along hills, offsets and the vertical sections. Use the elevation difference separately.